== Products
==
Marine Anchor Chain
Offshore Moor Chain
Accessory
 
Newly-reconstructed 20MN proof load testing machine passed installation & debugging
2002/09/18 22:35
    The domestic biggest and most advanced 20MN anchor chain proof load testing machine passed installation & debugging in Zhenjiang Anchor Chain Factory. It came into use on July 1st, 2002. The factory has totally invested 400 million Yuan (RMB) for this project. It lasts two and a half month. The machine was repaired and re-equipped with modern fittings. Also it has passed the inspection of Measurement Technical Institute of JiangSu Province. It¡¯s favorable for the factory to manufacture long continuous offshore mooring chain in big size.
                                                                                         Copyright©Zheng Mao Group Co., Ltd.                    Supported by Focus Technology Co.,Ltd.